We have made great progress with "The Barn"...(and I say "we", but really I have very little to do with this barn!)
Getting the siding on the outside walls...first the insulation, then the siding
One side all done, moving onto the other side now
finishing up the roof
The lift is used to bring the roof pieces up on top
The flooring was purchased online from a church in Iowa...it was shipped and was being stored in the Snook's garage
Scott used the lift to bring it down to The Barn and using the arm extension, is able to place it on the floor
Jamie is directing traffic 



We are now waiting for the lights to be delivered, that will be the next installation, after the lights then the floor can be laid.  After the floor, some laminate will go on the lower half of the walls to protect the insulation from getting ripped my balls. Then we need to build some interior walls for the tractor storage and the exercise room.  Lots to do yet...I will keep you posted!